LNM is ALMOST done with supports! I was hoping to finish them tonight, but calling this work tedious would be an understatement, and I'm going through great lengths to get it right.
So first, I thought I'd show you guys a REALLY rare shot of LNM under construction before the tunnel, to compare with the support work for the tunnel.
- Here's the real deal before the tunnel was built
- lnmconst_132.jpg (51.93 KiB) Viewed 1526 times
- Here's the same view on the recreation!
- I've continued work with landscape along side supports
- Lift 1
Still left on LNM:
Last supports for the turnaround over Grim's Landing (modern day Land of the Dragons)
Supports for Lift 2
Finish evac catwalks for Lift 1/2/Block Brakes
Finish brake maintenance catwalks.
Hope I have 3d modeling skills by this point to make 3ds for LNM!
I'll likely finish LNM before going back to work on Wolf/Drachen just because I'm so close to being done with LNM from a "stock" perspective, and I'll likely get all 3 to that point before 3ds start coming in.