Alot of you know I have alot of projects out there. Everytime I start a new one I obviously get the "what happened to _____?" and "Cant you finish a ride?" questions. Here are your answers.
Listed by ride name on the NLDC page
19TI - On Hold. Track is done. Requires alot of 3ds work that takes motivation because of the scale of the project. Long term.
CCI001 - Test ride. Unlikly to be released.
The Unknown - Most likly never will be released. Forces are way to strong and my original plans fell through because supporting a terrain + 3ds terrain ride would be a nightmare and a half. And with the entire ride above the ground, it looks silly.
The Wooly Bear! - Good chance it gets fixed up. Most likly it would be a suprise upload.
Talon - Dorney Park - Track is 100% done and has been for a very long time. I have shifted the 3ds work from Frenzy to pkigoer because Frenzy has taken on quite a few other projects and I wish to get this project released as soon as possible. pkigoer is working on a Wicked Twister recreation and honing his skills but that wont take very long.
Hydra - The Revenge - BETA version released with NL 1.6. Wont go back to it for awhile because it was frustrating enough to get all I did done in 3 weeks.
TGG001 - Possible finish in a month or 2. Depends on how much I devote to Maverick. Trackwork is almost done and supporting wouldnt be hard.
There ya go. Theres a run down of everything else I have thats "in the works" minus a few more secret projects. I work best working on multiple projects at once because I learn from each project and that way I can carry it over to a ride in progress instead of feeling a need to redo everything once its finished. It makes the process take longer, however, as stated above, Ive got a couple tracks done that just need finishing touches. And my other secret projects are going to be more simple and feature little to no extras.