Hi, Maverick at cedar point is a pretty good coaster...im trying to build a coaster were the track goes below the lift and the 2nd train is going down the hill, then they cross. It can be found at the end of this youtube video (only 0:20 long) http://www.youtube.com/watch?v=9uZy3DdB19I ,so does anybody know how to get the trains to cross like that, i know it has something to do with the block brakes but does anybody know how to get them crossing like that for sure???
Last edited by RideWarriorNation on August 26th, 2010, 4:59 pm, edited 1 time in total.

Post August 26th, 2010, 5:03 pm

Posts: 6183
Points on hand: 483.00 Points
Bank: 19,590.00 Points

Post August 26th, 2010, 5:24 pm
RideWarriorNation User avatar
Beta Tester
Beta Tester

Posts: 1447
Points on hand: 1,533.40 Points
Bank: 0.00 Points

Post August 26th, 2010, 5:33 pm

Posts: 1536
Points on hand: 2,597.00 Points
He means you'd have to dispatch the second train at the right time and have enough track after the block to allow the second train to get up the lift while the first is traversing track. The track needs to be the right length and the trains need to be dispatched properly.

Post August 26th, 2010, 11:27 pm

Posts: 65
Points on hand: 908.00 Points
Location: Williamsburg, VA, VA, USA
I would say that you could set it to Manual Dispatch, and time it just right. First get a stopwatch and time how long it takes for you to keep the train in the station. If the train comes early send it a little later, if it takes long than expected then have it come a little earlier.