I started over because I thought the ride was boring and didn't use the terrain and I want to give my self a challenge. It's similar to Ravine Flyer 2. The bridge is 1/4 done and the supports will be mostly done by hand so the ride is realistic. So here are some pictures [peakhill]
EW I realy don't like that turn. This will have to be fixed.
Over 5 seconds of airtime as of now.
This is what I have left to use[:)]
What do you guys think? I know it needs smoothing out a lot. I am hand building. The ride will have steel supports so yeah. Any suggestions?