It's not like it's a major change, all he has to do is un-tunnel it. If I was CJD, I would keep a copy of the track that is up, and when hyyyper puts the new one on, see if there are anydifferences in track, supports, scenery, etc.
hyyyper, you cannot upload a second time. I will, however, delete all of the tunnels before riding it, since it was an honest mistake. Just edit the description to include the information, and I will be sure to do that.
I would just make sure that when you delete the tunnels you delete them by track type to avoid messing up any special setting hyyyper has done to the track.
I would just make sure that when you delete the tunnels you delete them by track type to avoid messing up any special setting hyyyper has done to the track.
there aren't any
btw, some section of my track are tunneled to be a tunnel, if you get what i mean...
I've made a fair bit of 3ds progress since last time, I've now got some Switchtracks, an Onride photo shop, and a prelift Tunnel. All that's left to do now is some q lines, exit paths, and an entrance sign. I should have it finished by the end of friday at this rate.