Board index Theme Park Discussions Theme Park News & Construction! "Maverick" Construction - CP 2007

"Maverick" Construction - CP 2007

Theme Park Construction And News Forum

Post September 12th, 2006, 3:20 pm

Posts: 3018
Points on hand: 2,931.00 Points
Location: USA
then why does the camera get wet...huh?! huh!? huh?! haha

Post September 12th, 2006, 3:39 pm
coolbeans326 User avatar
Premium Member
Premium Member

Posts: 5229
Points on hand: 6,184.00 Points
Location: Portland, OR, USA

^ well from the looks of it, it looks like the sprinklers could have gotten it. It also got partially wet from the mist. And then there is that big white blur exiting the tunnel. I'm sure they have some water effect there aswell, seeing as it doesn't appear to have a splash at the end. SO all wetness is induced by sprnklers or mist.

Also you know that there is no splash right at the end, because when it stops at the blocking brake, you can see the boat in front of you and you'll noticed that doesn't touched the water, and the track after the final drop is just as level as that piece of track so you know there was no incline, so you know there was no splash there. So there you go. Doesn't touch any water except for those sprinklers on some of the drops, the other water effects, and the mist.

Post September 14th, 2006, 5:35 pm
coolbeans326 User avatar
Premium Member
Premium Member

Posts: 5229
Points on hand: 6,184.00 Points
Location: Portland, OR, USA


Post September 14th, 2006, 5:45 pm

Posts: 891
Points on hand: 2,510.00 Points
Location: Highland, Illinois, USA


Post September 14th, 2006, 7:43 pm

Posts: 1018
Points on hand: 6,575.00 Points
Location: Akron, Oh, USA

you know they already toped it off? The added the top piece on mon and started the lift on tue.
Cedar Point
2008-2015
--2015--
Beach Band- June-August
https://www.facebook.com/TrumpetDMR

Post September 15th, 2006, 1:12 pm
Brtnboarder495 Premium Member
Premium Member

Posts: 2511
Points on hand: 5,367.00 Points

Post September 15th, 2006, 2:02 pm

Posts: 891
Points on hand: 2,510.00 Points
Location: Highland, Illinois, USA


Post September 15th, 2006, 2:05 pm

Posts: 3018
Points on hand: 2,931.00 Points
Location: USA

Post September 15th, 2006, 2:26 pm

Posts: 5626
Points on hand: 5,993.00 Points
Location: Millbrook, Alabama, USA

Originally posted by CoAsTeRkRazY

This ride WILL be of the chain

It will be "off" the chain as well since it uses LIMs. <eye roll>
Sometimes the best thing to say is nothing at all.

Post September 16th, 2006, 1:52 pm

Posts: 273
Points on hand: 4,300.00 Points


Post September 16th, 2006, 6:04 pm

Posts: 2748
Points on hand: 4,830.00 Points
Location: Medinah, Il, USA


Post September 16th, 2006, 7:48 pm

Posts: 5286
Points on hand: 3,059.00 Points
Location: USA
Yup, I saw them install the last bottom peice today. Was kind of interesting, I havent seen an actual track placing since...I think ever. Was kind of cool.

Post September 16th, 2006, 9:09 pm

Posts: 5626
Points on hand: 5,993.00 Points
Location: Millbrook, Alabama, USA

Originally posted by FlyingV

LSM, actually.
Yeah, those. Long day yesterday. [lol]

Post September 17th, 2006, 2:14 am

Posts: 257
Points on hand: 3,012.00 Points
Location: Austria

Post September 21st, 2006, 4:36 pm

Posts: 257
Points on hand: 3,012.00 Points
Location: Austria

Post September 21st, 2006, 4:41 pm

Posts: 5367
Points on hand: 1,916.00 Points
Location: San Antonio, Texas, USA


Post September 21st, 2006, 6:24 pm

Posts: 127
Points on hand: 2,590.00 Points
Location: funchester, VA, USA
so thats what they've been working on...I keep looking at the main construction cam and not seeing anything. Now that I have another viewpoint I can completely control the construction!![lol][sillyme]

Post September 21st, 2006, 11:07 pm
coolbeans326 User avatar
Premium Member
Premium Member

Posts: 5229
Points on hand: 6,184.00 Points
Location: Portland, OR, USA

jeez, they're really blasting through construction. The ride will be finished in no time. So then I imagine theming, and wiring will take up the rest of the time. Leaving about a month in a half, or more, for testing and figuring out the optimal way of running this thing.

Post September 24th, 2006, 8:50 pm

Posts: 2145
Points on hand: 3,189.00 Points
Location: Toronto, Ontario, Canada

Yea, the site says the construction will be done by december.

Post September 24th, 2006, 8:53 pm

Posts: 5367
Points on hand: 1,916.00 Points
Location: San Antonio, Texas, USA

I wouldn't be surprised if the track is all up by Halloween.

Post September 24th, 2006, 8:59 pm

Posts: 2171
Points on hand: 1,469.00 Points
Location: La Verne, CA, USA

Post September 24th, 2006, 9:43 pm

Posts: 868
Points on hand: 4,391.00 Points
Location: Indianapolis, IN, USA
Supposedly it takes time for them to calibrate the LSMs, so thats part of why its being built so quickly.

Post September 24th, 2006, 9:45 pm

Posts: 891
Points on hand: 2,510.00 Points
Location: Highland, Illinois, USA

I've come to realize the tunnel launch may not be that grand. Mr. Freeze hits 70mph in 230ft give or take. This is going to hit 70 or so in 350-400. I realize all the tunnel may not be launch, but I don't think we're going to get much feeling out of it.

Post September 24th, 2006, 10:00 pm

Posts: 5367
Points on hand: 1,916.00 Points
Location: San Antonio, Texas, USA

The element of surprise, especially if it is pitch black in there.

Post September 25th, 2006, 8:24 am
coolbeans326 User avatar
Premium Member
Premium Member

Posts: 5229
Points on hand: 6,184.00 Points
Location: Portland, OR, USA

it'll be a little bit better then CA Screaming's launch, which imo is fun enough. [:)]

PreviousNext

Return to Theme Park News & Construction!

 


  • Related topics
    Replies
    Views
    Last post