Board index Theme Park Discussions Theme Park News & Construction! Kings Island - 2009 B&M Hyper Construction

Kings Island - 2009 B&M Hyper Construction

Theme Park Construction And News Forum

Post November 14th, 2008, 11:56 am

Posts: 1613
Points on hand: 62.00 Points
uh... that drop is really sexy, thought i might throw that out there.
So, my friend came up to me the other day and asked if I wanted a frozen banana, and I said no, but I want a normal banana later, so... yea.

- RIP Mitch Hedberg

Post November 14th, 2008, 4:27 pm

Posts: 2113
Points on hand: 2,704.00 Points
(druling over georgeous, 0g, diving, steep, swiss artwork)

Im speechless.

Post November 14th, 2008, 6:01 pm

Posts: 215
Points on hand: 1,603.00 Points
Location: Cincinnati, Ohio, USA
Man oh man oh man oh man oh man this is going to be a LONG Offseason waiting for this thing to open!!!!!

Post November 15th, 2008, 12:38 am

Posts: 5286
Points on hand: 3,059.00 Points
Location: USA
Originally posted by CoastaGuy

I would guess they don't use those supports because they don't need to use that much steel at all, it's just an extra cost for nothing.

Compare that picture of Nitro to this one of Behemoth, you can see they used much less steel than they used to. http://www.rcdb.com/ig4005.htm?picture=6


Might have more to do with the fact that Nitros lift goes over water. So centralizing the supports on either side and fanning them out could have been the most cost effective way.

Post November 15th, 2008, 12:49 am
jayman Premium Member
Premium Member

Posts: 4811
Points on hand: 3,120.00 Points
Location: spring valley

YAY!!!!
it's real! sorry my post has nothing to do with the topic nice to hear from you!

Post November 15th, 2008, 12:57 am

Posts: 2145
Points on hand: 3,189.00 Points
Location: Toronto, Ontario, Canada

Originally posted by Real

Originally posted by CoastaGuy

I would guess they don't use those supports because they don't need to use that much steel at all, it's just an extra cost for nothing.

Compare that picture of Nitro to this one of Behemoth, you can see they used much less steel than they used to. http://www.rcdb.com/ig4005.htm?picture=6


Might have more to do with the fact that Nitros lift goes over water. So centralizing the supports on either side and fanning them out could have been the most cost effective way.


Oh alright, I had no idea it went over water. Makes sense, though.

That drop is awesome looking, so photogenic!

Post November 15th, 2008, 7:42 pm

Posts: 200
Points on hand: 1,117.00 Points
Location: Lobith, Gelderland, Netherlands

looks sweet, very nice. Hopefully ride this major coaster sometime.

Post November 26th, 2008, 11:08 am

Posts: 1936
Points on hand: 7,125.00 Points
Location: orlando


Post November 26th, 2008, 11:15 am

Posts: 312
Points on hand: 121.00 Points
Location: USA
http://www.kidiamondback.com/public/latest/gallery/

More pictures have been added to the Diamondback website. According to the blog, the station floor is being poured today.

Post November 26th, 2008, 9:11 pm

Posts: 215
Points on hand: 1,603.00 Points
Location: Cincinnati, Ohio, USA

Post November 26th, 2008, 9:21 pm

Posts: 1613
Points on hand: 62.00 Points
^ Yum.
So, my friend came up to me the other day and asked if I wanted a frozen banana, and I said no, but I want a normal banana later, so... yea.

- RIP Mitch Hedberg

Post November 27th, 2008, 5:44 am
gouldy User avatar
Premium Member
Premium Member

Posts: 7827
Points on hand: 3,639.00 Points
Bank: 25,088.00 Points
Location: WOLVERHAMPTON, England.


Post November 27th, 2008, 10:58 am

Posts: 2113
Points on hand: 2,704.00 Points

Post December 9th, 2008, 9:19 am
gouldy User avatar
Premium Member
Premium Member

Posts: 7827
Points on hand: 3,639.00 Points
Bank: 25,088.00 Points
Location: WOLVERHAMPTON, England.


Post December 20th, 2008, 8:12 pm

Posts: 2145
Points on hand: 3,189.00 Points
Location: Toronto, Ontario, Canada


Post January 26th, 2009, 10:35 pm

Posts: 1936
Points on hand: 7,125.00 Points
Location: orlando

Diamondback- Complete

Workmen finished installing track on the new Diamondback roller coaster today at Kings Island. Track piece #129 was the final piece of track installed on the 5,282 foot-long $22 million steel coaster, being hoisted into place at approximately 2:42pm.

Image
It took the Adena Corporation a total of 161 days to erect the ride after the first piece of track was installed in the splashdown area on August 18, 2008.

Image

Image

Image

Image

The ride is going to be ready for opening day of the park according to Kings Island.

picts from kingsisland.com

Post January 27th, 2009, 1:08 pm

Posts: 312
Points on hand: 121.00 Points
Location: USA
http://www.kiextreme.com/gallery/thumbn ... ?album=368

KIExtreme has posted a gallery full of flyover pictures of the completed Diamondback. The ride in general looks great!

Post January 29th, 2009, 5:54 pm

Posts: 1536
Points on hand: 2,597.00 Points

Post January 29th, 2009, 6:40 pm

Posts: 5852
Points on hand: 5,806.00 Points
Location: Toronto, Ontario, Canada

It would be awesome if B&M would do some high speed, low to the ground turns.

Post January 29th, 2009, 8:35 pm
Coasterkidmwm User avatar
True Addicts
True Addicts

Posts: 12283
Points on hand: 8,049.10 Points
Bank: 15,000.00 Points
Location: Illinois, USA
No no no see that would require having G's. They don't do that anymore.
"Careful man, there's a beverage here!"

Post January 31st, 2009, 12:25 pm

Posts: 325
Points on hand: 3,123.00 Points
Isn't Raging Bull the only one of the hypers that has low terrain turns?

Anyway, besides that this is pretty beautiful. A KI trip would be a nice 16th birthday present.

Post January 31st, 2009, 12:48 pm

Posts: 5367
Points on hand: 1,916.00 Points
Location: San Antonio, Texas, USA


Post January 31st, 2009, 1:00 pm

Posts: 1936
Points on hand: 7,125.00 Points
Location: orlando

Batman at SFNE has a cool low to the ground turn if I remember correctly.

Post January 31st, 2009, 4:19 pm

Posts: 1613
Points on hand: 62.00 Points
^ it does, and its very forceful and very fun.
So, my friend came up to me the other day and asked if I wanted a frozen banana, and I said no, but I want a normal banana later, so... yea.

- RIP Mitch Hedberg

Post February 7th, 2009, 8:24 pm

Posts: 1605
Points on hand: 3,805.00 Points
Bank: 0.00 Points
Location: UK
Originally posted by Austin

Diamondback- Complete

Workmen finished installing track on the new Diamondback roller coaster today at Kings Island. Track piece #129 was the final piece of track installed on the 5,282 foot-long $22 million steel coaster, being hoisted into place at approximately 2:42pm.

Image
It took the Adena Corporation a total of 161 days to erect the ride after the first piece of track was installed in the splashdown area on August 18, 2008.

Image

Image

Image

Image

The ride is going to be ready for opening day of the park according to Kings Island.

picts from kingsisland.com


you know what, i don't care if it's immature and unproffesional or not, but:

hahahaaaa... erect.

the deed is done.
Cradled by two loving arms that I'd die for,
One little kiss and Felina goodbye.

PreviousNext

Return to Theme Park News & Construction!

 


  • Related topics
    Replies
    Views
    Last post