Board index Roller Coaster Games Hard Hat Area Gravity Group Hybrid

Gravity Group Hybrid

The Hard Hat Area is the place to post construction news about your ride, so this is the place to hype your future upload!

Post May 3rd, 2009, 9:28 pm

Posts: 1026
Points on hand: 3,540.00 Points
Location: Miami, FL, USA

Post May 3rd, 2009, 9:48 pm

Posts: 1613
Points on hand: 62.00 Points
lol, i didnt get it either...
So, my friend came up to me the other day and asked if I wanted a frozen banana, and I said no, but I want a normal banana later, so... yea.

- RIP Mitch Hedberg

Post May 3rd, 2009, 10:56 pm

Posts: 1928
Points on hand: 1,601.00 Points
Location: OH, USA

Post May 3rd, 2009, 11:49 pm

Posts: 1026
Points on hand: 3,540.00 Points
Location: Miami, FL, USA
Uhm... I dont know where that would fit into my coaster...
-Tony.

Post May 4th, 2009, 7:29 pm

Posts: 6183
Points on hand: 483.00 Points
Bank: 19,590.00 Points

Post May 4th, 2009, 8:32 pm

Posts: 6124
Points on hand: 10,012.00 Points
Location: Minnesota, USA
Just because a layout is out and back doesn't mean it'll have adjacent trackwork that the bridge could accommodate.

Post May 4th, 2009, 8:36 pm

Posts: 1026
Points on hand: 3,540.00 Points
Location: Miami, FL, USA
Sorry to disappoint, but this ride will NOT be featuring a bridge.
-Tony.

Post May 4th, 2009, 8:39 pm

Posts: 325
Points on hand: 3,123.00 Points
This thing looks wicked. Though I shouldn't be judging before I see a complete layout.

Post May 4th, 2009, 9:37 pm

Posts: 2252
Points on hand: 5,889.00 Points
Location: Illinois (SFGAm), USA
I can't wait for this one, I'm a sucker for CCI and Gravity Group coasters.
American Eagle Lover

Post May 4th, 2009, 11:10 pm

Posts: 1928
Points on hand: 1,601.00 Points
Location: OH, USA
Looks like a sweet ride...forgot to mention that in my last post.
Like, REALLY sweet ride. It's gonna be awesome! And, the fact that you are supporting the ENTIRE thing by hand...wow...I barely have the patience to do a steel coaster by hand!

Post May 4th, 2009, 11:18 pm

Posts: 1026
Points on hand: 3,540.00 Points
Location: Miami, FL, USA
A steel coaster doesnt take much patience.
Only a few hours of work. (depending on how big the coaster is....)

I'll also give out a few stats for you guys since I wont be releasing the layout.


Roller Coaster: Unknown
Classification: Roller Coaster
Type: Wood - Sit Down
Status: Under Construction
Designer: The Gravity Group, LLC
Categories: Hybrid (Steel Structure)


Length: 3677'
Height: 112'
Drop: 117'
Inversions: 0
Max Vertical Angle: 64 Degrees
Max Horizontal angle: 90 Degrees
-Tony.

Post May 4th, 2009, 11:20 pm

Posts: 1928
Points on hand: 1,601.00 Points
Location: OH, USA
"A steel coaster doesnt take much patience.
Only a few hours of work. (depending on how big the coaster is....)"

I know. That was my point!

Post May 16th, 2009, 5:18 pm

Posts: 6183
Points on hand: 483.00 Points
Bank: 19,590.00 Points
Hows are the construction workers doing on this coaster?

Post May 16th, 2009, 5:22 pm

Posts: 1026
Points on hand: 3,540.00 Points
Location: Miami, FL, USA
From what I've heard, there has been some delays due to the inclement weather ;)
-Tony.

Post May 16th, 2009, 5:37 pm

Posts: 6183
Points on hand: 483.00 Points
Bank: 19,590.00 Points
So after you upload your B&M hyper, workers will resume construction?

Post May 16th, 2009, 5:52 pm

Posts: 1026
Points on hand: 3,540.00 Points
Location: Miami, FL, USA

Post June 22nd, 2009, 9:53 am

Posts: 1149
Points on hand: 1,004.00 Points
Location: Virginia, USA

Previous

Return to Hard Hat Area

 


  • Related topics
    Replies
    Views
    Last post