Well here is pleasant news about the opening...
The ride was scheduled to open on the 15th of this month, but did not, because of a pneumatic launch FAILURE.
It now has a TBA opening, obviously until they fix the problem...
If I was to travel all the way up there to ride this thing, I won't now. I mean think about it...if you fail a launch attempt, and burst the fluid valve that holds the fluid that is required to launch the train, and you're launching a train over 130mph..., what if it happened later on in operation again!
A crazy experiment of a ride that has already gone wrong...lol, no thanks, i'll pass on it.
"Don't be a disability"... yep, still keeping that.