Board index Roller Coaster Games Hard Hat Area Champ -Complete- A7XandCoasters

Champ -Complete- A7XandCoasters

The Hard Hat Area is the place to post construction news about your ride, so this is the place to hype your future upload!

Post January 23rd, 2010, 11:02 pm

Posts: 655
Points on hand: 2,333.00 Points
Location: Minnesota, USA
Champ, I believe, is my proudest creation yet. It is my first stab at a coaster inspired by the fantastic Expeditoin Geforce (and I guess a little by Goliath). Before any questions pop up, my CCI is still in progress.

Stats

Height of drop: about 167 ft
Speed: 70 mph
Length: 4360 ft

Progress (COMPLETE)

Trackwork: 100%
Supports: 100%
3ds: 100%
Terrain: 100% (need proper environment)

I may want some testers so if you are interested, just post down below.

Image Insert:
Image
68.23 KB


Image Insert:
Image
132.42 KB


Image Insert:
Image
69.74 KB
Last edited by A7XandCoasters on February 9th, 2010, 8:42 pm, edited 1 time in total.

Post January 23rd, 2010, 11:40 pm

Posts: 1928
Points on hand: 1,601.00 Points
Location: OH, USA
That looks awesome! Is it hand-built, or Newtoned? I have almost no 3ds experience, but I'd love to test if you want. I do have some experience there.

Post January 23rd, 2010, 11:44 pm

Posts: 655
Points on hand: 2,333.00 Points
Location: Minnesota, USA

Post January 23rd, 2010, 11:46 pm

Posts: 1928
Points on hand: 1,601.00 Points
Location: OH, USA

Post January 24th, 2010, 4:55 pm

Posts: 655
Points on hand: 2,333.00 Points
Location: Minnesota, USA
Here are some more pics



Image Insert:
Image
93.75 KB



Image Insert:
Image
83.04 KB


Image Insert:
Image
110.67 KB

Post February 8th, 2010, 9:56 pm

Posts: 655
Points on hand: 2,333.00 Points
Location: Minnesota, USA
I was originally planning on releasing Champ this weekend, but my computer came down with a nasty bug and I wasn't able to gain access to it.

Progress
Trackwork: complete
Supports: Complete
Terrain: Complete
3ds: Complete

All thats needed to be done is package the ride with the environment, so if anyone would like to help out, it would be great.

Here's some new pics.



Image Insert:
Image
75.27 KB


Image Insert:
Image
59.3 KB

Image Insert:
Image
150.94 KB

Image Insert:
Image
147.05 KB

Image Insert:
Image
180.55 KB

Image Insert:
Image
130.3 KB

Image Insert:
Image
153.4 KB

Image Insert:
Image
174.08 KB

Post February 9th, 2010, 8:58 pm

Posts: 1149
Points on hand: 1,004.00 Points
Location: Virginia, USA
I'll package it for ya if you want
Just keep scrolling...

Post February 9th, 2010, 10:29 pm

Posts: 1928
Points on hand: 1,601.00 Points
Location: OH, USA

Post February 10th, 2010, 5:40 pm

Posts: 1908
Points on hand: 232.00 Points
Location: USA
Looks good, but imo, lighten the black to a greyish color for the station. Itll look better with the ride's colors.
Originally posted by GerstlCrazy:
The more time I spend on this website adds more to the impression that this has become a daycare.

Post February 13th, 2010, 12:26 pm

Posts: 655
Points on hand: 2,333.00 Points
Location: Minnesota, USA
Ok, there has been some confusion about the packaging. Can anybody tell me how to package an evironment?

Post February 13th, 2010, 2:04 pm

Posts: 2864
Points on hand: 4,152.00 Points
Location: Monroeville, PA, USA

You need to download the update for the trackpackager. The update is simply another .exe file. Just replace the old .exe in the Program Files/Nolimits Track Packager directory. It should do it for you after that.

Post February 13th, 2010, 2:57 pm

Posts: 655
Points on hand: 2,333.00 Points
Location: Minnesota, USA
Ok, so I downloaded the update, and I'm slightly lost on how to get the packager to include the environment in the package.

Post February 14th, 2010, 3:31 am
A7 User avatar
Premium Member
Premium Member

Posts: 688
Points on hand: 153.00 Points
Location: Prescott, Arizona, USA
It should just go in automatically now. If it isn't then you probably should re-read the instructions that Jimmy posted above.

Post February 14th, 2010, 1:40 pm

Posts: 655
Points on hand: 2,333.00 Points
Location: Minnesota, USA
Alright, thanks guys, I think I got it. Champ should be released today!

Post February 14th, 2010, 2:39 pm
slosprint User avatar
Premium Member
Premium Member

Posts: 3649
Points on hand: 5,728.00 Points
Location: MA, USA
Sweet, I can't wait... Actually I can due to the fact that I have nothing better to do.
Boulder Dash was the only good roller coaster.

"or if you're when the hydraulic fluid was dumped out of the motor is goes 200ft up the tower and is like "LOL nope"" - CKMWM 2016

Post February 14th, 2010, 2:53 pm

Posts: 1613
Points on hand: 62.00 Points
Please learn to use sketchup... This ride would look soo much hawter if you had a 3D'd station.
So, my friend came up to me the other day and asked if I wanted a frozen banana, and I said no, but I want a normal banana later, so... yea.

- RIP Mitch Hedberg

Post February 14th, 2010, 5:45 pm

Posts: 655
Points on hand: 2,333.00 Points
Location: Minnesota, USA
^ sorry, it's a little late, but I'll take that into consideration for my next ride.

Champ has been released!


Return to Hard Hat Area

 


  • Related topics
    Replies
    Views
    Last post
cron