Before the new update, I would like to thank both CKMWM and Mikey on shaping tips and capacity improvement suggestions (although everything on the track I am using was done myself). So without further ado, the update!
I have removed the banking on the turn out of the station, and it now runs more smoothly and looks nicer imo.
2 more blocks have been added, which allows now for a smooth 4 train operation.
The ascent has been steepened and smoothed, so now there are less noticeable pumps and the forces are reduced. it also allowed me to increase the launch speed slightly, so that there is less risk of a rollback.
The drop has also had some work done to it, and it now runs more smoothly.
The brake hill has been elongated a bit, but don't worry, it still provides a pop of airtime only now it runs smoother.
The trains now dispatch more frequently, allowing for a higher capacity. As you can see here, just as one ascends the hill another drops.
Looking up at the tower.
Boulder Dash was the only good roller coaster.
"or if you're when the hydraulic fluid was dumped out of the motor is goes 200ft up the tower and is like "LOL nope"" - CKMWM 2016