Zippin Pippin (testing!!)

Theme Park Construction And News Forum

Post November 7th, 2010, 1:10 pm

Posts: 1443
Points on hand: 1,085.00 Points
Location: Ohio
Image

Image

Image
The lift motor!

Image
A view of the first drop.

Image

Image
Beautiful! Just beautiful!

Image
This picture shows the progress of zone one and two. The highlighted bents are up and it also shows the dates they were erected.

To see more photos of construction, visit this blog!
http://zippinpippin.blogspot.com/

You could view photos on Facebook
http://www.facebook.com/#!/pages/Bay-Be ... 5671213192

Info about the ride:http://rcdb.com/9088.htm
Last edited by fear the four on April 25th, 2011, 11:04 pm, edited 1 time in total.
This is not my signature.

Post November 7th, 2010, 2:32 pm

Posts: 6183
Points on hand: 483.00 Points
Bank: 19,590.00 Points

Post November 7th, 2010, 3:05 pm

Posts: 2482
Points on hand: 209.00 Points
Bank: 311.00 Points
Location: Switzerland
Fun fact:This was Elvis Presleys favourite coaster.

Post November 7th, 2010, 4:14 pm

Posts: 2113
Points on hand: 2,704.00 Points

Post November 7th, 2010, 4:23 pm

Posts: 2482
Points on hand: 209.00 Points
Bank: 311.00 Points
Location: Switzerland
But the reconstruction is going on since some months yet,there are frequent updates on Facebook.

Post November 8th, 2010, 1:13 pm

Posts: 414
Points on hand: 1,598.00 Points
Location: Toledo, Ohio, USA
Who's making it?
A man has needs and that needs is booze.

Post November 8th, 2010, 2:19 pm

Posts: 2077
Points on hand: 4,765.00 Points
Location: Canton, Massachusetts, USA

Gravity Group did the engineering/foundation plan/bent plan but the profile is the same as the original John Miller configuration as it was in Memphis, besides maybe some modifications to fit the new site. I'm not sure if it's M&V doing the construction or Green Bay's parks dept doing it in house.

Post November 8th, 2010, 6:28 pm
Dirk_Ermen User avatar
True Addicts
True Addicts

Posts: 13387
Points on hand: 2,180.50 Points
Bank: 45,000.00 Points
Location: Noord-Brabant, Netherlands
It's looking great so far. Can't wait to see it finished. [:)]
Coastercount: 1410 (I've seen the world and it's horrid contraptions... @.@)
- Wood: 142
- Steel: 1268

Post November 8th, 2010, 6:50 pm

Posts: 2252
Points on hand: 5,889.00 Points
Location: Illinois (SFGAm), USA
^you have to hit Wisconsin on your next trip =D
American Eagle Lover

Post November 9th, 2010, 9:48 pm

Posts: 414
Points on hand: 1,598.00 Points
Location: Toledo, Ohio, USA
Whooo. Now I have another excuse to go to Wisconsin besides a Packers game. :D
A man has needs and that needs is booze.

Post November 23rd, 2010, 12:25 am

Posts: 1443
Points on hand: 1,085.00 Points
Location: Ohio

Post November 23rd, 2010, 12:53 am

Posts: 2252
Points on hand: 5,889.00 Points
Location: Illinois (SFGAm), USA

Post November 29th, 2010, 6:30 pm

Posts: 1443
Points on hand: 1,085.00 Points
Location: Ohio
Well I missed a construction update! oops...

From Wednesday...

Image

Image

Image

Image

Image

Next week the structure for turn 2 should be complete; according to workers on the site they plan to be finished by Tuesday (11/30). Structure work will then begin in zone 3, this work should progress very quickly since the height is much less in this zone. They expect to have the entire structure completed by Christmas, the remainder of the winter construction will then consist of completing the track and adding mechanical elements like brakes, lift mechanism, and transfer mechanism.


More Photos: http://zippinpippin.blogspot.com/2010/1 ... 42010.html

Looks like the park is having some money issues for constructing the ride...

http://www.greenbaypressgazette.com/art ... ost-rising
This is not my signature.

Post December 6th, 2010, 4:20 pm

Posts: 1443
Points on hand: 1,085.00 Points
Location: Ohio

Post April 25th, 2011, 11:03 pm

Posts: 1443
Points on hand: 1,085.00 Points
Location: Ohio

Post April 25th, 2011, 11:06 pm

Posts: 5286
Points on hand: 3,059.00 Points
Location: USA
I did not realize it was going to use 3 bench PTCs. Thought those were basically extinct from new designs.

Post April 25th, 2011, 11:29 pm
Metazoanhaddock User avatar
Moderator
Moderator

Posts: 1758
Points on hand: 3,382.00 Points
Bank: 52,337.00 Points
Location: Seattle, Washington
^except its an older design
Head Moderator
Director, Structural Engineer - PEAK Amusements
Site Contest Judge (Supporting)
Chatroom Admin

Post April 25th, 2011, 11:51 pm

Posts: 2077
Points on hand: 4,765.00 Points
Location: Canton, Massachusetts, USA

They're from the Raceworld ride. They used all the mechanical stuff from it. Not sure that I like that they used all 5 cars though, especially seeing how it crawls. Think 3 or 4 would pace better.

Post April 26th, 2011, 12:56 am

Posts: 5286
Points on hand: 3,059.00 Points
Location: USA
Originally posted by Metazoanhaddock

^except its an older design


Only in layout. The actual track design will be just like their other new stuff. It wont have the old transitions that the old rides had.