Here's the revised layout/finale. I chopped off the MCBR. Ride length is just right to run two trains.
Image Insert:
273.59 KB
Image Insert:
255.64 KB
Image Insert:
278.35 KB
I wanted to get in some track interaction. So a dive cork (just like the first element, just smaller) over and around the lift, runs under the pre-lift, into a cork roll then into a helix above an open roof station.
Thoughts on the layout? (I promise it's butter). Testers??