Originally posted by NightwindElf
I love how such a big, coaster building company hand builds in NL. And then pumps the track all over the place.
First of all, it wasn't really that bad. Second, I wouldn't be at all surprised if, given the new pics of the layout, that this was a preliminary design, whipped together quickly enough for the other team members to judge it before porting all of their design work over to AutoCAD or something.