http://nldc.interfix.net/p209
I wanted to do this project once it started to get going. The shaping was so odd on it that I just knew I had to attempt it. The only problem was there wasnt any way I would be able to do the 3ds or surrounding areas, I have since quit doing that stuff majorly since TTD2003.
Thats when I contacted Tyrant who completely willingly agreed to take on this project with me.
I will be in control of the track and supports and Tyrant will supply some breathtaking 3d work to flesh out the ride. Tyrant is also good for other things like checking the accuracy, bitching and whining. Hes quite good at the latter two.
But in all seriousness, my goal is to produce a ride experience no ones gotten from a recreation yet. Yea, not even TTD should compare. Tyrant has ridiculous skills in both texturing and modeling which will be just as much an asset to the ride as the time Im spending perfecting the track. I spent just over 2 days working on the station-lift hill and I think its come out quite well.