Coaster must run smoothly with 3 trains
that's an awful lot, most coasters under 100 ft tall don't even have an MCBR, how are we suppose to be expected to run 3 trains smoothly?
My design won't allow a 3rd train. So could we just have points deducted or something, or would it not be possible to win if we don't have a 3rd train?
hmm, I guess I'm gonna have to redo the ride[:(]