Overview-
The blast is fast and somewhat unexpected for unknowing riders. Of course us experts or smart people in the public could know its there, but some people might not, giving it a slight element of surprise. The first element is a curve-like element, and intentionally generating lateral G's of about 1.6 on the switch of banking from right to left. Don't worry though, that may seem like a lot, but it isn't there for more than 0.5 seconds. The follows a Corkscrew element, then a turn, then a dragged out long twist, generating some even negative G's. Then a turn, then a small bunny hop giving quick ejector air. Then a finishing overbanked turn sort of element, going somewhat slow throughout the top to generater almost 0 vertical G's. Also, prefabricated supports will be placed where nessesary. Just a heads up. I believe that not every single thing needs to be custom. As in the prelift/bottom of lift on a coaster, those can be prefabs IMO. Your comments?
Progress-
Trackwork is done, and details and supports need to be added. No name thought of yet.
Data-
Track Type..........: Steel Looping Coaster (Modern)
Track Length........: 716.80 meters / 2351.67 feet.
Number of Trains....: 2
Cars per Train......: 4
Lowest Track Height.: 1.14 meters / 3.74 feet.
Highest Track Height: 21.19 meters / 69.52 feet.
Area Track Requires.: 106.41 x 91.24 x 20.05 cubic meters.
..................... 349.11 x 299.34 x 65.78 cubic feet.
I am not sure when it will be done, or when I will have some screenshots.