Board index Roller Coaster Games Hard Hat Area Taipan GCI Wooden Mini Project

Taipan GCI Wooden Mini Project

The Hard Hat Area is the place to post construction news about your ride, so this is the place to hype your future upload!

Post March 12th, 2012, 10:11 pm
Goku1910 User avatar
Premium Member
Premium Member

Posts: 486
Points on hand: 2,514.00 Points
Bank: 2,212.00 Points
Location: USA
Last night I decided to tackle a GCI....This is another first for me and I think the track work is OK. So far support work is hell as I'm trying to add an additional look to it with steel beams above intersections and transfer tracks; if anyone would like to collaborate on that, I'd greatly appreciate it, just PM me.

Here's the first screen:

Image

Post March 12th, 2012, 11:40 pm

Posts: 649
Points on hand: 1,771.00 Points
Location: boston, massachusetts, USA

Doesn't look particularly 'mini'...

JK. Looks fun.

Post March 13th, 2012, 12:46 am
Coasterkidmwm User avatar
True Addicts
True Addicts

Posts: 12283
Points on hand: 8,049.10 Points
Bank: 15,000.00 Points
Location: Illinois, USA
Longer train perhaps? I only see 8 cars.
"Careful man, there's a beverage here!"

Post March 13th, 2012, 2:06 am
Goku1910 User avatar
Premium Member
Premium Member

Posts: 486
Points on hand: 2,514.00 Points
Bank: 2,212.00 Points
Location: USA
Originally posted by Halo364

Doesn't look particularly 'mini'...

JK. Looks fun.


I call it "mini" because I didn't spend a lot of time on track work like I did with other rides. It's just a quick put-together. The Station, though will be made just like Dragon's...Fancy. Although no more clutter.

Originally posted by Coasterkidmwm

Longer train perhaps? I only see 8 cars.


It was actually seven cars, but after you brought it up I switched to eight, this is the most I could add due to station length. Thanks for suggesting. EDIT: Scratch that, I increased the length of the station and cut into Brake two, and it surprisingly works, but it's tight.

Post March 19th, 2012, 10:49 pm
Goku1910 User avatar
Premium Member
Premium Member

Posts: 486
Points on hand: 2,514.00 Points
Bank: 2,212.00 Points
Location: USA
I uploaded some screens to show the current progress on the 3DS model. Almost there, transfer and basic framework for the station is done. I still need to create a dynamic component for fencing, stairs, and railings. Once that's done it's simply copy and pasting.

https://www.facebook.com/media/set/?set ... 055&type=1


Return to Hard Hat Area

 


  • Related topics
    Replies
    Views
    Last post