*sigh* Another project I'm having to put on the back burner. The concept works, but I can only have transfer tables with tracks 65 feet apart. I know, 65 feet should be more than enough for most needs, but I need about 250 feet to make a vertical lift.
I haven't given up on this one, but I have to rethink what I'm going to do.
Anyway, it's scripted all the way up to going back into the station. It leaves the station, gets on the lift, the lift goes up and the train leaves the lift all by itself at which time the lift returns down to be ready for the next train. Here are a couple of shots of the lift taking the train up and returning back down when it is done.
Image Insert:
225.05 KB
Image Insert:
289.98 KB